Tasks
Displaying task list
Display open tasks that must be completed within the next 90 days.
1. "Office"
2. "Tasks"
1. Select the top line in the task list.
2. To select a sorting criterion:
> "Priority (!)"
> "Subject"
> "Due date"
1. Select the desired task.
2. To scroll through the task, if necessary:
> Turn the controller.
> Select the
symbol.
Using contact data
Contact data from appointments, tasks, text messages, emails, and notes can be stored or selected.
Reading a task aloud
Reading a task aloud.
See also:
Displaying, setting or changing the limit
1. "Settings"
2. "Speed"
3. "Warning at:"
Warning at
4. Turn the controller until the desired limit is
displayed.
5. Press the controller.
The speed limit is st ...
Incoming call
Receiving calls
If the number of the caller is stored in the phone
book and is transmitted by the network, the
name of the contact is displayed. Otherwise,
only the phone number is displayed.
I ...
The concept
The Active Protection safety package consists
of systems that are independent of each other:
▷ PreCrash
▷ PostCrash ...